澳洲幸运5
热门标签

Fukushima debris removal delayed by another year

时间:1个月前   阅读:6

手机新2管理端www.99cx.vip)实时更新发布最新最快最有效的手机新2管理端网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

约搏单双www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,约搏单双游戏数据开源、公平、无任何作弊可能性。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:Telegram怎么搜索群聊:No change in power tariff for all consumers in second half of 2022

下一篇:环球ug开户:Former UK ambassador to Myanmar detained in Yangon

网友评论